How To Apply For Installation Of Solar Rooftop Plant
- The beneficiary must be electrical consumer of H.P.S.E.B.L.
|
- The beneficiary has to apply for consent to A.E., H.P.S.E.B.L. of the concerned Sub Division —– Net Metering Application form/Approval form C/List of sub-Division of H.P.S.E.B.L. – Click Here
|
- After obtaining consent from H.P.S.E.B.L., the beneficiary can install the system from HIMURJA empanelled firms. You may also contact office of Project Officer, HIMURJA for finding out the empanelled firms —– District-wise list available – Click Here
|
- The beneficiary will have to pay only 30% of the total cost of the system and the State Subsidy (4000 per kWp) will be deposited in his account —- Rates available – Click Here
|
- After installation of the Plant it will be inspected by concerned Project Officer, HIMURJA in the District —- Contact list available – Click Here
|
- After inspection the Empanelled firm will submit the case to HIMURJA, Shimla for release of subsidy —– Details of documents required – Click Here
|